Special Situations / Construction
CFO for a Contractor in Financial Distress: Jobs, Surety, and Cash
A full backlog and an empty bank account is a construction specialty. We find which jobs are feeding the company and which are eating it, get the billing caught up, and give the surety and the bank numbers they can believe.
- Cost to complete, job by job, without optimism
- Underbilled work, change orders, and retainage turned into cash
- Surety and bank reporting rebuilt
- Subcontractor and supplier payments put in order
The backlog is the largest in company history and the controller has stopped answering when you ask about cash. Three jobs are in the last 10 percent, which is the expensive 10 percent. The framing sub on the largest job wants a joint check. Your bonding agent called twice last week about the work-in-progress schedule, and the schedule says the company made money, which is hard to square with the overdraft.
Contractors fail differently from other businesses. They fail busy. Cash from the new job pays the bills on the old one, estimated profit is booked before it is earned, and the gap stays invisible until one bad project or one slow-paying owner exposes it. By then the problem is on every job at once.
A distressed contractor needs a CFO who reads a job cost report as easily as a balance sheet. Our principal has led finance for a multi-entity construction and field-services organization through restructuring and Chapter 11, and has spent a career in job costing, work in progress, liens, claims, and lender reporting. This is the work we know best, in the situation that leaves the least room for learning on the job.
How a busy contractor runs out of money
It starts with front-loaded billing on a good job, which feels like profit and is really a loan from the owner. That cash covers the overrun on a bad job. The next mobilization is funded by the deposit on the one after it. Each step is rational, and together they build a company that must keep winning work to pay for work it has already done.
The work-in-progress schedule is supposed to catch this. It does not when the cost-to-complete estimates are stale, because a job reported at 60 percent complete with a healthy margin can be 45 percent complete with none. The first sign in the financial statements is usually a growing underbilled balance, which is reported as an asset and is frequently a loss that has not been admitted yet.
Job-by-job triage: finish, renegotiate, or exit
The first deliverable is an unsentimental cost to complete on every open job, built with the project managers and then checked against purchase orders, subcontract balances, and the labor still required. Not what the estimate said. What it will take from today. Jobs then sort into three groups: those that will throw off cash, those that will break even if managed tightly, and those that will consume cash until the day they close.
Each group gets a different plan. Profitable jobs get the best crews and the fastest billing. Marginal jobs get a weekly cost review. The losers get a decision: push change orders and claims, renegotiate schedule or scope with the owner, or, with counsel and often the surety involved, evaluate a way out. Finishing a bad job is sometimes the cheapest option. It should be chosen with the numbers on the table, not by default.
- Cost to complete rebuilt from commitments and remaining labor
- Cash flow by job for the next 13 weeks
- Jobs ranked by cash contribution, not booked margin
- A written plan for every losing job
Billing is the fastest money you have
In a distressed contractor the largest source of new cash is usually work already performed. Pay applications filed late because the schedule of values was not updated. Change orders done on a handshake and never priced. Stored materials not billed. Retainage on jobs that reached substantial completion months ago, waiting on a punch list nobody owns.
We run billing like a production line for 30 days. Every job gets a pay application on the first day the contract allows. Every unapproved change order gets a number, a document, and a name responsible for chasing it. Every retainage balance gets a closeout checklist. Then someone with authority calls the owner or the general contractor about anything past due. Lien and notice deadlines are tracked alongside, under your attorney's guidance, because those dates do not move.
A change order without paperwork is a donation.
The surety conversation
A contractor's surety is underwriting the company's ability to finish. When the financial statements wobble, the bonding agent's questions get sharper and bond capacity shrinks. Without bonds, the next public or large private job disappears, and so does the cash flow that was supposed to fund the recovery.
Sureties respond to the same things lenders do: early notice, accurate numbers, and a plan. We rebuild the work-in-progress schedule so it ties to the general ledger and the job cost system, prepare the interim statements and the backlog report the underwriter asks for, and join the meeting. Bad news delivered by the contractor with a recovery plan lands very differently from bad news the surety discovers in a year-end review. If the surety is asked to support a troubled project, the terms are a matter for counsel, and we supply the financial picture underneath.
Subcontractors, suppliers, and the order of payment
Payment order in construction has legal weight. Subcontractors and suppliers on a project may have lien and bond claim rights. Owners may require lien waivers before releasing the next draw. Some states have rules about how money received for a project may be used. Those questions are for your construction attorney. The cash plan has to respect the answers.
So the 13-week forecast is built by job. Receipts on each project are mapped to the subs and suppliers on that project, joint check requests and waiver requirements are tracked, and general overhead is funded from what is left, in the open. Subs who are told the truth, given a schedule, and paid on it tend to stay on the job. Subs who are told nothing file paperwork.
Right-sizing around the work that pays
Once the open jobs are understood, the harder question is what the company should be. Which project types, sizes, and customers have made money over the last three years, at real labor burden and real overhead, and which have been subsidized. The answer usually points to a smaller company with better margins, and to an estimating process that has been using yesterday's costs.
We rebuild margin by job type and customer, reset burden and overhead rates for bidding, and size overhead to the backlog that deserves to be kept. If lenders need to be brought along, the work continues as a lender workout. If the balance sheet cannot be repaired outside a court process, that decision is made with bankruptcy counsel, and the financial leadership it requires is something our principal has provided before.
What you get
Deliverables installed in the first 90 days
Cost-to-complete review
Every open job re-estimated from commitments, remaining labor, and field input, with the gap to the last WIP schedule explained.
Job-level 13-week cash forecast
Receipts and payments by project, so each job's cash funds its own subs and suppliers first.
Billing and change order sprint
Pay applications current, unapproved changes documented and priced, and stored materials billed.
Retainage recovery plan
Every balance with a closeout checklist, a responsible person, and a target date.
Surety and bank package
A WIP schedule that ties to the ledger, interim statements, a backlog report, and a recovery plan.
Margin and overhead reset
Profitability by job type and customer, corrected burden rates for estimating, and overhead sized to the work worth keeping.
Engagement arc
How the first 90 days unfold
Week 1
Cash
Cash count, payroll protected, and the billing status of every open job listed.
Weeks 2 to 4
Triage
Cost to complete on every job, jobs ranked by cash, and the billing sprint running.
Days 30 to 60
Report
WIP rebuilt and tied, surety and bank meetings held with a recovery plan.
Days 60 to 120
Resize
Margin by job type, estimating rates reset, and overhead matched to the backlog worth keeping.
This is for you if
- General and trade contractors with a strong backlog and chronic cash shortages
- Contractors whose WIP schedule shows profit the bank account cannot find
- Companies whose surety has reduced capacity or asked for interim financials
- Contractors with one or two problem jobs threatening the rest
- Owners behind with subcontractors and suppliers who need a plan before the liens arrive
It is not for you if
- Legal advice on liens, bond claims, contract termination, or project-fund rules; that is your construction attorney's work
- Contractors who want the WIP schedule to say something the jobs do not support
- Companies with no open work and no intention of bidding more
FAQ
Questions owners ask on the first call
Our WIP says we are profitable. Why are we out of cash?
Usually for two reasons. Cost-to-complete estimates are stale, so revenue has been recognized on profit the jobs will not deliver. And billing is behind the work. Rebuilding cost to complete on every job is the first thing we do, and it tends to explain the overdraft quickly.
Should we tell our surety?
Sureties, like lenders, respond better to early, accurate news with a plan than to surprises. How and when to communicate is a judgment to make with your bonding agent and, where project support is involved, your attorney. We prepare the financial package and attend the meeting.
Can you help us get paid on change orders and retainage?
Yes. That is the fastest cash a contractor has. We document and price unapproved changes, bring pay applications current, and run closeout checklists on retainage. Disputed claims and anything involving lien or notice rights are coordinated with your construction attorney.
Do you understand construction accounting, or only finance?
Construction accounting is the firm's priority specialty: percentage-of-completion revenue, WIP schedules, over and under billings, job cost, retainage, committed costs, labor burden, and bonding reports. Our principal has led finance for a multi-entity construction and field-services organization, including through a restructuring.
We may need to walk away from a job. Can you advise on that?
We can show you what finishing costs, what stopping costs, and what each does to cash, bonding, and the other jobs. Whether and how to exit a contract is a legal question with serious consequences, and your construction attorney must lead it. The surety usually needs to be part of that conversation too.
What does it cost, and how fast can you start?
Engagements start at $8,500 a month and can begin within days. We are based in Scottsdale, Arizona, and work with contractors nationwide, with on-site time in the first weeks, because cost to complete is built in the trailer and not on a video call.
Do you replace our controller or project accountants?
No. They keep posting costs and processing pay applications, with tighter cost codes, a billing calendar, and a reviewer. Often the accounting staff has known about the problem jobs for months. They needed someone senior to say it out loud.
What happens when the company is stable?
The job-level forecast, the billing calendar, and the WIP process are documented and handed to your team. From there the work can continue as a construction CFO engagement on a fractional cadence, since the monthly WIP review is the habit that keeps the problem from returning.
Keep reading
Where this work shows up
The industries that lean on this service most, the articles that go deeper, and the calculators that put a number on it.
Industries
- ConstructionJob costing the field trusts, a WIP schedule your bonding agent believes, and a cash forecast that sees the payroll before it leaves. Finance leadership for contractors doing $3M to $50M.
- General ContractorsMost of the money on a general contractor's income statement belongs to someone else. Finance leadership that keeps the pass-through moving, protects the fee, and gets the surety what it needs before it asks.
- Electrical ContractorsCopper moves, gear lead times stretch, and the labor estimate is the whole game. Finance leadership for electrical contractors who bid, build, and service, and need one set of books that tells the truth about all three.
- Plumbing ContractorsNew construction pays in three draws per lot, service pays at the door, and the builder pays when the builder pays. Finance leadership for plumbing contractors who need one set of books across all of it.
Insights
- Why Profitable Construction Companies Run Out of CashThe job will earn 20 percent at closeout. It will bleed for five months first. Here is the mechanism, a worked example with real arithmetic, and what a weekly cash discipline does about it.
- Financial Management During a Business RestructuringWhether the restructuring is a quiet workout with the bank or a court-supervised case, the finance function's job is the same: know the cash, control the cash, and report it before anyone asks. Here is what that looks like week by week.
- How to Calculate WIP for a Construction CompanyThe WIP schedule is the one report that tells a contractor the truth about every open job. Here is how to build it, line by line, with the formulas, a full worked schedule, and the mistakes that make bonding agents nervous.
Calculators
- Full-Time vs. Fractional CFO Cost CalculatorSalary is the smallest part of what a CFO costs. Put in the real numbers and compare them with a fractional engagement sized to your company.
- Working Capital CalculatorWorking capital is the money the business needs to run between the day you spend and the day you get paid. Here is how much you have, and how much you need.
- Construction WIP CalculatorEnter contract value, estimated cost, cost to date, and billings to date. Get percent complete, earned revenue, and whether the job is overbilled or underbilled.
Financial assessment
Find out which jobs are paying for the others.
Tell us how many jobs are open, what the bank and the surety have said, and when payroll is due. We will tell you what the first two weeks would uncover.