Scottsdale, AZ·Nationwide

Call (602) 892-5281
Interim Controller& CFO Partners

Service Areas / Dallas-Fort Worth, Texas

Fractional CFO & Controller Services for Dallas-Fort Worth Businesses

CFO-level financial leadership without the cost of a full-time CFO. We serve Dallas-Fort Worth remotely from Scottsdale, Arizona, with on-site visits across the Metroplex when the work calls for it.

  • Remote-first delivery with on-site days in Dallas, Fort Worth, and the northern suburbs
  • Weekly cash forecasts built for Texas lien deadlines and 60-day pay cycles
  • More than 20 years in construction, homebuilding, and building-materials finance, including Texas homebuilding operations
  • Fractional Controller from $2,500 a month, Fractional CFO from $3,500

Drive north on the Dallas North Tollway past Frisco at seven on a weekday morning and count the cranes. Then count the concrete trucks headed the other way toward the data-center pads in Red Oak and the tilt-wall boxes along Interstate 20 in Grand Prairie. Somewhere in that traffic is a mechanical contractor whose crews will work 10-hour days on a job that will not pay a first application for 75 days. Payroll is Friday. The line of credit is the bridge, again.

Dallas-Fort Worth added 123,557 residents from mid-2024 to mid-2025, the second-largest gain of any metro in the country, and Collin County alone added 42,966 people, more than all but one county in the nation. Industrial developers had 24.0 million square feet under construction across 86 projects at midyear 2026, and the Dallas Fed's July 2026 release put job growth at 3.9 percent in Fort Worth and 3.7 percent in Dallas against a statewide forecast of 2.0 percent. The work is not the problem. The distance between the work and the accounting is.

Interim Controller & CFO Partners is based in Scottsdale, Arizona, and serves Dallas-Fort Worth remotely, with on-site visits scheduled for the assessment and for the meetings that matter. The principal has spent more than 20 years in finance leadership across construction, building materials, homebuilding, and field services, including senior accounting responsibility for a Texas homebuilding region, and has run treasury, job costing, lender reporting, and 13-week cash models for multi-entity contractors. You get a fractional CFO who has closed the books in Texas, not one who has flown over it.

01

The Dallas-Fort Worth problem: growth that outruns the back office

A Metroplex contractor rarely runs short of opportunity. It runs short of the working capital and the reporting that opportunity requires. An electrical contractor in Lewisville doing $8 million a year wins a $5 million package on a data-center campus and discovers that the general contractor pays on a 60-day cycle and the owner's lender wants a WIP schedule before it releases the next draw. The bookkeeper who was adequate at $4 million is now closing the month five weeks late.

The pattern is consistent across the region. Receivables stretch while the line of credit carries payroll. Change orders are performed in Plano and never billed from the office in Irving. The bank asks for covenant compliance and gets a spreadsheet with three tabs named Final. Meanwhile, every construction accountant worth hiring has an offer from a homebuilder or a data-center developer, and a $12 million subcontractor cannot match the signing bonus.

The fix is a sequence, not a hire. Assess what is actually true about cash, margin, and debt. Clean up the ledger so the numbers can be believed. Stabilize the weekly cash cycle and the monthly close. Document the process so it survives without us. Then transition it to your team. That is how a $5 million company in Denton becomes a $20 million company without the accounting department becoming the reason it stalls.

02

Who we help in the Metroplex

Our clients are privately held companies between roughly $3 million and $50 million in revenue, owned by the people who run them. In Dallas-Fort Worth that means general contractors working the corporate relocations in Frisco and Plano, HVAC contractors and plumbing contractors running fleets out of Garland and Mansfield, electrical contractors on the data-center pads in Red Oak and along Interstate 35W north of Fort Worth, homebuilders and land developers in Collin and Denton counties, and the building-materials yards and distributors that supply all of them. We also serve home-services companies and professional-services firms.

The situations repeat. The owner approves every check and has no idea what next month looks like. The controller left for a public company in Las Colinas. The bank wants monthly reporting and a WIP schedule, and both are late. A surety has capped the bonding program because nobody could explain the under-billings. Revenue doubled in two years and the close did not keep up. A sale, a partner buyout, or an acquisition is coming and the books would not survive diligence.

You should hire someone else if you need bookkeeping alone, tax preparation, an audit opinion, or legal advice. We work alongside the people who do those things and hand them cleaner books. If your plan is to hire a full-time CFO and hope the ledger cleans itself, we will talk you out of it on the first call, at no charge.

03

Fractional CFO services in Dallas-Fort Worth

A fractional CFO gives you the judgment of a chief financial officer for a fraction of the week and a fraction of the cost. In practice that is a 13-week cash forecast updated every Monday, a managed bank relationship, bid decisions made with job-margin data, and a monthly package that says where the money went. The national fractional CFO page covers the full scope. This page is about how it works between Fort Worth and McKinney.

Metroplex lenders have been through more than one building cycle, and they read WIP schedules closely. A contractor bidding on data-center or industrial work along the southern corridor needs to know, before signing, whether it can fund 90 days of labor and material ahead of a first payment. A homebuilder in Celina needs a lot-takedown schedule that matches the sales pace. Those are CFO questions. We answer them with a model, a bank conversation, and a decision, usually in the same week.

Engagements start at $3,500 per month for a Fractional CFO and $8,500 per month for an Operating CFO who owns the finance function day to day. CFO Advisory starts at $5,000, Embedded CFO at $12,500, and interim leadership is custom. Those are starting points, not quotes. Final pricing reflects company size, entity count, transaction volume, the condition of the books, and urgency. One-time cleanup, software, and travel to Texas are separate unless expressly included.

04

Controller services in Dallas-Fort Worth

A controller's job is to make the numbers true and on time. Our fractional controller closes the month within 10 business days, keeps a job-cost ledger that ties to the general ledger, produces a WIP schedule a Texas surety can read, runs receivables and payables on a calendar, and reconciles every bank, loan, and credit-card account monthly. For a contractor that includes retainage tracking, change-order billing, and percentage-of-completion adjustments. For a distributor it includes inventory valuation and margin by line.

In the Metroplex the hard part is not the work. It is keeping the person who does it. The corporate headquarters that moved to Plano and Frisco hire accountants by the hundred, and the public homebuilders hire from the same pool. A fractional controller solves that by running the function and documenting it, so the next hire inherits a process instead of a mystery. We work in QuickBooks, Sage 300 CRE, ServiceTitan, JD Edwards, and Power BI.

Controller engagements start at $2,500 per month. The scope is written down on day one and the deliverables are the same every month: financial statements, job-cost reports, WIP, aging, and a cash position you can read in five minutes. When the company is ready for a full-time controller, the documented process goes with the job. Fix it. Run it. Document it. Hand it off.

05

Construction and skilled-trade finance in Texas

Texas does not issue a statewide general contractor license. The trades are another matter. Air conditioning and refrigeration contractors and electrical contractors are licensed through the Texas Department of Licensing and Regulation, plumbing contractors through the Texas State Board of Plumbing Examiners, and Metroplex cities layer their own permitting on top. What replaces the license as a gate on growth is the surety. Bonding capacity rests on a credible WIP schedule, consistent gross margin by job, working capital that does not evaporate at year end, and an owner who can explain the numbers. We build that package and keep it current.

Texas lien law is a calendar, and the calendar changed. For original contracts signed on or after January 1, 2022, a subcontractor on a nonresidential project preserves its rights by sending notice to the owner and the original contractor by the 15th day of the third month after each month it furnished labor or materials; on residential work it is the 15th day of the second month. Miss the date and the money you are owed becomes a conversation instead of a claim. We build the notice calendar into the billing process, and your construction attorney reviews the rest.

Texas sales tax on construction turns on how the contract is written. A lump-sum contract makes the contractor the consumer of materials and taxable on its purchases; a separated contract makes the contractor a retailer of the incorporated materials and requires collecting tax from the customer, while nonresidential repair and remodeling is taxable regardless. We do not give tax advice. We make sure job setup, contract form, and the ledger capture what your CPA needs, and we get the CPA in the room before the first invoice goes out.

06

Turnaround and cash-flow support

Trouble in the Metroplex tends to arrive in the same order. The line of credit is fully drawn by spring and stays there. Payroll taxes slip a quarter. A supplier in Grand Prairie moves you to COD. The surety asks for an updated WIP schedule and goes quiet after reading it. By the time the bank calls, the owner has been funding payroll from savings for months and calling it a bridge. None of that is fatal if someone takes control of cash in the next two weeks.

We start with a 13-week cash forecast built from actual receivables, actual payables, and actual payroll, not the budget. Then vendor triage: who gets paid, when, and what they are told. Then a lender conversation with a plan attached, because Texas banks extend patience to borrowers who show up with numbers. The principal has led finance through a Chapter 11 process, including debtor-in-possession operations and court-required reporting, so nothing on the list will be new. Our turnaround CFO and 13-week cash-flow forecast pages cover the mechanics.

The current cycle is uneven. Data-center and industrial work is running hot in the southern corridor while the region's overall growth cooled to 1.4 percent, down from 2.3 percent the year before, and Dallas County itself lost roughly 2,600 residents. A framing contractor tied to entry-level housing and an electrical sub turning down work in Red Oak need the same thing: a real margin by job, a cash forecast that goes past next Friday, and the discipline to stop taking work that loses money slowly.

07

Dallas-Fort Worth-specific financial challenges

The data-center wave has rewritten the rules for subcontractors. A campus like the one DataBank is building in Red Oak, financed with roughly $2 billion in construction debt, runs on tier-one general contractors and payment terms written for companies far larger than a $10 million electrical sub. A sub that takes a package sized at half its annual revenue has just doubled its working-capital need. We model the cash curve of the job before you sign, size the credit line to it, and put the retainage and notice deadlines on a calendar.

Weather in North Texas is a cash event, not a footnote. A hard freeze stops concrete and drives HVAC contractors and plumbing contractors into weeks of emergency work that arrives all at once and then vanishes. Summer heat compresses productive hours on roofs and slabs. A forecast that assumes the same crew hours every month is wrong twice a year. We build seasonal labor and equipment curves into the plan so the January spike and the August squeeze are financed instead of discovered.

Growth itself is the third challenge. The northern suburbs are absorbing corporate relocations, and the companies that serve them are scaling faster than their reporting. A company that triples in two years needs credit, controls, and a close it has not earned yet, and a lender will finance that growth only when the reporting proves it is profitable. Somewhere in Collin County an owner is about to learn that his largest customer, the one everyone is proud of, has never made him a dollar. Better to find out in a spreadsheet than in a bank meeting.

  • Data-center and industrial subcontract packages modeled for cash before they are signed
  • Texas lien notice deadlines built into the monthly billing process
  • Lump-sum versus separated contract treatment captured in job setup for the CPA
  • Freeze-season and heat-season labor curves priced into forecasts
  • Surety and bank packages built on a credible WIP schedule and real working capital
  • Growth financing sized to the working capital a larger backlog actually requires
  • Competition for construction accountants answered with a documented, transferable process

Market notes

What we are watching in Dallas-Fort Worth

Facts cited on this page, with their sources and the month we last checked them. We refresh these periodically.

  • The Dallas-Fort Worth-Arlington metro added 123,557 residents from July 1, 2024, to July 1, 2025, the second-largest numeric gain among U.S. metros; regional growth slowed to 1.4 percent from 2.3 percent the prior year, the metro population reached roughly 8.4 million, and Dallas County lost roughly 2,600 residents.

    U.S. Census Bureau, Vintage 2025 Population Estimates press release, 'Slow Growth Impacts Nation's Largest Counties Hardest' (March 26, 2026); Dallas Morning News, 'D-FW adds 120,000-plus people, census report shows' (March 26, 2026) · 2026-03

  • Collin County added 42,966 residents from July 2024 to July 2025, a 3.4 percent increase to nearly 1.3 million, the second-largest numeric county gain in the nation.

    U.S. Census Bureau, Vintage 2025 Population Estimates press release (March 26, 2026), https://www.census.gov/newsroom/press-releases/2026/2025-popest-metro-micro-counties.html · 2026-03

  • The Dallas Fed's July 2026 Texas Employment Forecast projected statewide job growth of 2.0 percent for 2026 (80 percent confidence band 1.5 to 2.5 percent); among major metros, Fort Worth reported growth of 3.9 percent and Dallas 3.7 percent.

    Federal Reserve Bank of Dallas, 'Dallas Fed: Texas employment forecast strengthens' (July 17, 2026), https://www.dallasfed.org/news/releases/2026/nr260717forecast · 2026-07

  • Dallas-Fort Worth had 24.0 million square feet of industrial space under construction across 86 projects in Q2 2026, up 9.0 percent quarter over quarter; vacancy was 8.3 percent and net absorption was 9.9 million square feet.

    CBRE, 'Dallas/Fort Worth Industrial Figures Q2 2026' (July 9, 2026), https://www.cbre.com/insights/figures/dallas-fort-worth-industrial-figures-q2-2026 · 2026-07

  • DataBank secured roughly $2 billion in construction financing for its Red Oak data-center campus south of Dallas; the campus is planned at nearly 300 acres with eight two-story buildings, and the first three facilities total 600,000 square feet and 180 MW.

    Data Center Dynamics, 'DataBank secures $2bn construction financing for Dallas data centers'; Dallas Morning News, 'Inside look at construction in DataBank's Red Oak data center campus' (2026) · 2026-08

  • Texas has no statewide general contractor license. Air conditioning and refrigeration contractors and electrical contractors are licensed by the Texas Department of Licensing and Regulation; plumbing contractors are licensed by the Texas State Board of Plumbing Examiners; municipalities impose their own registration and permitting.

    Texas Department of Licensing and Regulation, https://www.tdlr.texas.gov/; Procore, 'Texas Contractor Licensing Rules & Requirements' · 2026-09

  • Under Texas Property Code Chapter 53 as amended by HB 2237 (original contracts on or after January 1, 2022), subcontractors on nonresidential projects must send notice to the owner and original contractor by the 15th day of the third month following each month labor or materials were furnished; on residential projects, by the 15th day of the second month.

    Allensworth, 'HB 2237: Changes to Texas Mechanic's Lien Laws'; Texas House Research Organization bill analysis, HB 2237 (87th Legislature) · 2026-09

  • Texas sales and use tax treats lump-sum construction contracts (contractor pays tax on materials purchased) differently from separated contracts (contractor collects tax on incorporated materials as a retailer); nonresidential repair and remodeling is taxable regardless of contract form.

    Texas Comptroller of Public Accounts, Publication 94-157 and 34 TAC Rule 3.291, as summarized by Freeman Law, 'Texas Sales and Use Tax Rules for Construction-Related Services' · 2026-09

FAQ

Questions Dallas-Fort Worth owners ask first

Do you have an office in Dallas-Fort Worth?

No. Interim Controller & CFO Partners is based in Scottsdale, Arizona, and works remote first. For Dallas-Fort Worth clients we schedule on-site visits for the assessment and for key meetings with your bank, surety, or leadership team, and the rest of the work runs on a weekly remote cadence. Travel is scoped in the engagement so there are no surprises.

Texas has no general contractor license. Does licensing still matter for our finances?

It does, in two ways. The trades are licensed through TDLR and the plumbing board, and lenders and sureties still ask for proof. More important, the surety fills the role a license plays elsewhere as the gate on growth, and it decides based on your WIP schedule, your margins, and your working capital. We build the financial package that keeps bonding capacity ahead of your backlog. We do not give legal advice on licensing.

Can you help with the Texas lien notice deadlines?

We build the notice calendar into the monthly billing process so the 15th-of-the-month deadlines are tracked alongside pay applications and retainage, and we track which projects are residential and which are not, because the deadlines differ. Your construction attorney reviews the notices and handles any claim. Our job is to make sure the dates are never missed because nobody was watching.

What does it cost?

Fractional Controller engagements start at $2,500 per month, Fractional CFO at $3,500, CFO Advisory at $5,000, Operating CFO at $8,500, and Embedded CFO at $12,500. Interim leadership is custom. Those are starting points, not quotes. Final pricing reflects size, entity count, transaction volume, the condition of the books, urgency, and what your bank and surety require. Travel to Texas is separate unless expressly included.

How quickly can you start, and how long does an engagement run?

An assessment usually begins within a week or two of the first call and takes two to three weeks, with one on-site visit. Stabilization engagements typically run six to 12 months. Ongoing fractional work continues month to month for as long as it earns its fee. If cash is critical, say so on the first call and we compress the assessment into days.

Do you work with our CPA and our bank in Dallas?

Yes. Your CPA keeps tax preparation, tax advice, and any attest work, including the lump-sum versus separated contract question on Texas sales tax. We hand them a reconciled ledger and a job-cost system that makes their work faster. With your bank, we produce the monthly package, the covenant calculations, and the WIP schedule, and we join the calls. Lenders prefer borrowers who arrive with numbers.

Our company is in Fort Worth, not Dallas. Is that a problem?

No. We serve the whole Metroplex, from Fort Worth and the AllianceTexas corridor to Arlington, Denton, Frisco, McKinney, and Red Oak. Because the work is remote first, the address matters less than the reporting. On-site days are planned around where your people and your projects actually are.

We are a distributor, not a contractor. Do you still fit?

Yes. The principal spent years leading finance for building-materials manufacturing, distribution, and retail operations, including acquisition integration and quality-of-earnings support. Inventory valuation, vendor rebates, margin by line, and a credit line sized to the season are familiar ground. Construction is our largest practice, not our only one.

What happens after the assessment?

You get a written findings memo: what is true about cash, margin, debt, and reporting, what needs fixing first, and a proposed scope with a starting price. If you proceed, the first 90 days are cleanup and stabilization: the close calendar, the cash forecast, the WIP schedule, and the lender package. Then we document what we built and either run it for you or hand it to your team.

Keep reading

What we do for Dallas-Fort Worth companies

Every service and industry page applies here. These are the ones owners in this market ask about first.

Services

Industries

Insights

Calculators

Nearby markets

Consultation

Schedule a Financial Assessment for your Dallas-Fort Worth company

Two to three weeks, one on-site visit in the Metroplex, and the rest remote from Scottsdale. You leave with a written picture of cash, margin, and debt plus a plan you can act on whether or not you hire us. Call (602) 892-5281 or use the contact page to schedule.

Confidential. Takes about two minutes. Every field helps us come to the first call prepared.

By submitting you agree to our privacy policy. We never sell or share your information.

Financial assessment

Let us look at what needs attention.

A confidential financial assessment starts with a 30-minute conversation about cash, reporting, and the decisions in front of you. No pitch deck. No obligation.