Scottsdale, AZ·Nationwide

Call (602) 892-5281
Interim Controller& CFO Partners

Service Areas / Richmond, Virginia

Fractional CFO & Controller Services for Richmond Businesses

CFO-level financial leadership without the cost of a full-time CFO. We serve Richmond remotely from Scottsdale, Arizona, with on-site visits when the work calls for it.

  • Remote first, with on-site days from Short Pump to Chester to Ashland
  • Cash forecasts built for industrial draw schedules, Class A license thresholds, and Virginia lien rules
  • More than 20 years in construction, building materials, and distribution finance
  • Fractional Controller from $2,500 a month, Fractional CFO from $3,500

It is a humid Thursday at Meadowville Technology Park in Chesterfield, and a plumbing contractor's crew is running underground on a factory site that will be 1.7 million square feet when it is done. The general contractor is a national firm with a 30-page invoicing manual. The sub's pay application went in on the first, was returned on the ninth for a missing lien waiver, and will be paid on the 45th day after it is resubmitted correctly. Payroll clears Friday. In Glen Allen, an HVAC contractor is finishing a tenant fit-out in a building whose owner has not decided whether to fund the next phase. Both owners are reading cash from a phone.

Richmond is growing into a bigger market than its back offices were built for. The metro added more than 12,000 people between July 2024 and July 2025 and nearly 60,000 since 2020, with Chesterfield County posting the largest numeric gain of any locality in Virginia. Industrial developers had 12.6 million square feet under construction at midyear 2026 with vacancy at 5.5 percent. A $1 billion toy factory, a $2.4 billion redevelopment around the new ballpark, and eight data-center projects in Chesterfield alone are on the boards. At the same time construction employment slipped 2.3 percent in the year to July 2026, which is what a market between two cycles looks like. The work is coming. The back office that can bid it, finance it, and collect on it is usually not ready.

Interim Controller & CFO Partners is based in Scottsdale, Arizona. Richmond is served remotely, with on-site visits built around the assessment and the meetings that matter. The principal has spent more than 20 years in finance leadership across construction, building materials, and distribution, including treasury, job costing, lender reporting, and 13-week cash models for multi-entity contractors. You get a fractional CFO or fractional controller who has rebuilt a WIP schedule the surety could believe, not a consultant who has read about one.

01

The Richmond problem: national owners, local balance sheets

Richmond companies rarely fail from lack of work. They fail from the distance between a national owner's payment process and a local company's balance sheet. The developers, manufacturers, and logistics operators building along Interstate 95 and Route 288 bring their own construction managers, their own invoicing systems, and their own retainage terms. A $7 million electrical contractor in Mechanicsville that wins a $2.5 million package on a distribution center has taken on months of labor and material before the first draw, and the bank has not been told. The bookkeeper who was fine at $3 million is now closing the books six weeks late.

The symptoms rhyme from company to company. Receivables age past 60 days while the line of credit covers payroll. Change orders are performed, argued about, and never billed. A pay application is rejected for a paperwork error and the resubmission resets the clock. The surety asks for a WIP schedule and receives a spreadsheet nobody trusts. Meanwhile, the accountant the company hired in 2023 has left for a bank in the West End, which offered a signing bonus and a parking deck.

The fix is the same sequence every time. Assess what is actually true about cash, margin, and debt. Clean up the ledger so the numbers can be believed. Stabilize the weekly cash cycle and the monthly close. Document the process so it survives without us. Then transition it to your team or a full-time hire when the company can support one. Assess, Clean up, Stabilize, Document, Transition. That is how a $5 million Richmond subcontractor grows into a $20 million one without the accounting department becoming the reason it stalls.

02

Who we help in central Virginia

Our clients are owner-operated private companies with revenue between roughly $3 million and $50 million. In the Richmond region that means general contractors in Henrico and Chesterfield, HVAC contractors and plumbing contractors serving the West End and the Southside, electrical contractors on industrial, data-center, and logistics work from Ashland to Hopewell, site and concrete subs on the Route 288 corridor, and the building-materials yards and distributors that supply all of them. We also work with home-services companies, professional-services firms, and the manufacturers' suppliers along the James.

The calls sound alike. The owner still approves every check and reads cash from the bank balance. The company outgrew its Class B license and the Class A application needs financial statements the bookkeeper cannot produce. The bank wants monthly covenant reporting and a WIP schedule, and both are late. A surety has capped the bonding program until the financials are credible. A second-generation owner is taking over and discovering what the first generation kept in a drawer. Or cash is short, the vendors are calling, and the owner needs a plan rather than reassurance.

We are the wrong hire if you need bookkeeping alone, tax preparation, an attest opinion, or legal advice; we coordinate with those professionals and stay in our lane. We are also the wrong hire if your plan is to bring on a full-time CFO and hope the books fix themselves, and we will say so on the first call, at no charge.

03

Fractional CFO services in Richmond

A fractional CFO delivers the judgment of a chief financial officer on a schedule and at a cost a growing company can carry. In practice that means a 13-week cash forecast updated every Monday, a bank relationship that is managed rather than endured, bid and pricing decisions made with margin data instead of instinct, and a monthly package that tells you where the money went and where it is going. The national overview of our fractional CFO service covers the full scope. This page is about how it works between Goochland and Petersburg.

Richmond lenders are relationship banks by tradition and they read WIP schedules with care. A contractor considering a package at Meadowville, on a Chesterfield data-center site, or on a speculative warehouse in Hanover County needs to know before signing whether it can fund the labor and material ahead of a first pay application, whether the line of credit will stretch, and what the retainage will do to year-end working capital. A distributor deciding whether to open a second yard in Colonial Heights needs the same model with inventory turns in it. Those are CFO questions. We answer them with a model, a bank conversation, and a decision, usually within the week.

The starting point for a Fractional CFO is $3,500 per month; for an Operating CFO who owns the finance function day to day it is $8,500. CFO Advisory starts at $5,000 and Embedded CFO at $12,500, and interim leadership is custom. A starting point is not a quote. Final pricing reflects company size, entity count, transaction volume, how the books look on day one, urgency, and what your lender and surety are asking for. Cleanup projects, software, and travel are separate unless expressly included in the scope.

04

Controller services in Richmond

A controller's whole job is true numbers, delivered on time. Ours close the month within 10 business days, maintain a job-cost ledger that ties to the general ledger, produce a WIP schedule the surety can read, run receivables and payables on a calendar instead of a mood, and reconcile every bank, loan, and credit-card account monthly. For a contractor that includes retainage tracking, change-order billing, lien-waiver management on every pay application, certified payroll support on public work, and the percentage-of-completion adjustments that turn a cash-basis guess into a real margin.

In Richmond the work is not the hard part. Keeping the person who does it is, when the banks, the insurers, the health systems, and the state all hire from the same pool of accountants. A $10 million contractor in Midlothian cannot outbid them for long. A fractional controller is the workaround. We run the function and document it, so whoever comes next inherits a process, not a mystery. We work in QuickBooks, Sage 300 CRE, ServiceTitan, JD Edwards, and Power BI, which covers most of what is installed between Short Pump and Chester.

Controller engagements begin at $2,500 per month. The scope is written on day one, the close calendar is published, and every month delivers the same package: financial statements, job-cost reports, WIP, aging, and a cash position that takes five minutes to read. When the company can support a full-time controller, the documented process is handed over with the job. Fix it. Run it. Document it. Hand it off.

05

Construction and skilled-trade finance in Virginia

Virginia licenses contractors by the size of the work, and the class you hold is a ceiling on the company. Class C covers projects from $1,000 to $10,000. Class B covers single projects up to $120,000 and $750,000 in any 12-month period, and requires a net worth of at least $15,000. Class A covers projects of any size and requires a net worth of at least $45,000, or a $50,000 surety bond in place of the showing. The net-worth test is where growing companies stumble: a contractor that distributed every dollar of profit to pay the owner's taxes may not qualify for the license its backlog requires. We build the balance sheet with the license threshold in mind, and we keep the renewal calendar inside the finance function.

Virginia's mechanic's lien law is unusually strict, and the strictness lands on cash. A memorandum of lien must be recorded within 90 days from the last day of the month in which the claimant last furnished labor or materials, and it may not include amounts for work performed more than 150 days before that last day. Include a stale invoice and the entire lien can fail, not just the excess. The memorandum must also be sworn. We do not give legal advice. We put the 90-day and 150-day windows on the billing calendar, job by job, so your attorney is consulted before a deadline, not after.

In this market surety capacity follows the financial statements, and the underwriter has to believe them: a WIP schedule that reconciles, consistent gross margins by job, working capital that does not vanish at year end, and an owner who can explain the numbers without a translator. National owners and their construction managers add prequalification, badging, and lien-waiver requirements of their own. Our principal has managed mechanic's liens, claims, and litigation support coordination for multi-entity contractors and has built the lender and surety package that keeps the next bid from waiting on the last close. Our construction CFO page covers the mechanics.

06

Turnaround and cash-flow support

Trouble in Richmond follows a familiar order. The line of credit is fully drawn in March and never comes back down. Retainage receivable grows into a number nobody says out loud. Payroll taxes slip a quarter. A supplier in Ashland moves you to COD. The surety asks for an updated WIP and goes quiet. By the time the bank calls, the owner has been funding payroll from savings for six months and calling it a bridge loan. None of that is fatal, provided someone takes control of cash inside two weeks.

We begin with a 13-week cash forecast assembled from the real receivables, the real payables, and the real payroll rather than the budget. Vendor triage follows: who is paid, when, and what each one is told. Then the bank, with a plan in hand, because lenders extend patience to borrowers who arrive with numbers. The principal has led finance through a Chapter 11 process, including debtor-in-possession operations and court-required reporting, so none of it will be new. Our turnaround CFO and 13-week cash-flow forecast pages explain the mechanics.

The current cycle is uneven here. Construction employment fell 2.3 percent and professional services fell 1.9 percent in the year to July 2026, even as industrial deliveries in the first half of the year were four times the prior year's pace. A residential trade tied to slowing home sales is resizing at the same time a site contractor in Chesterfield is turning down work. Both need the same things: margin by job that is real, a forecast that reaches past next Friday, and the nerve to stop taking work that loses money slowly. One of them is about to find out its oldest customer never made it a dollar, and the spreadsheet is the kindest place to learn it.

07

Richmond-specific financial challenges

Industrial and data-center work brings a particular cash pattern to a metro that did not used to see much of it. National developers, logistics operators, and hyperscale owners prequalify vendors, hold retainage, require conditional and unconditional lien waivers with every draw, and pay on approval chains that run through construction managers and lenders. A $4 million package at Meadowville or on a Route 288 warehouse can require four months of financing before the first dollar arrives, and it arrives on the schedule the owner wrote, never sooner. We run that model before the bid goes in, size the line to it, and place the Virginia lien windows on the same calendar as the billing dates.

Growth itself is the second challenge. Chesterfield and Henrico are adding residents faster than the trades can add crews, and a company doubling revenue needs working capital it has not earned yet. The Class A net-worth test, the surety's working-capital ratio, and the bank's covenant package all ask the same question in different words: did you keep enough of the profit in the company. The answer is a distribution policy set by a forecast rather than by the owner's tax bill, and a monthly package that shows the lender the company is growing profitably instead of just growing.

Summer is the third. Central Virginia's heat and humidity are not Phoenix, but July and August still cost a site or roofing crew productivity, and afternoon storms take days off the schedule that the bid assumed were there. Winter is milder than in Pittsburgh or Milwaukee and shorter, which is a reason the region attracts work, but ice storms and a wet spring can still push a February draw into April. We build seasonal productivity and weather curves into the forecast so the margin squeeze is planned rather than discovered, and so the line of credit is sized to the wet quarter rather than to the average.

  • National-owner invoicing, lien-waiver, and retainage requirements built into the job setup
  • Virginia Class A, B, and C thresholds and the net-worth test managed on the balance sheet
  • Virginia 90-day filing and 150-day inclusion rules built into billing rather than handled after the fact
  • Industrial, data-center, and logistics project cash cycles financed before the bid
  • Distribution policy set by forecast so growth does not starve working capital
  • Seasonal weather and productivity curves priced into bids and the cash forecast
  • A tight market for construction accountants answered with a documented, transferable process

Market notes

What we are watching in Richmond

Facts cited on this page, with their sources and the month we last checked them. We refresh these periodically.

  • Richmond, VA metro total nonfarm employment was 728.4 thousand in July 2026 (preliminary, not seasonally adjusted), down 0.8 percent year over year; construction employment was 46.0 thousand, down 2.3 percent; professional and business services was 124.1 thousand, down 1.9 percent; the unemployment rate was 3.8 percent.

    U.S. Bureau of Labor Statistics, 'Richmond, VA Economy at a Glance', https://www.bls.gov/regions/mid-atlantic/va_richmond_msa.htm · 2026-09

  • Metro Richmond added more than 12,000 people between July 2024 and July 2025 and nearly 60,000 between April 2020 and July 2025; Chesterfield County (401,301 as of July 1, 2025) registered the largest numeric population increase of any Virginia locality from 2020 to 2025; Henrico County was estimated at 342,775; immigration accounted for most of Henrico's and more than half of the city's 2024 to 2025 growth.

    Axios Richmond, 'Richmond area gained residents from 2024 to 2025' (March 31, 2026), citing U.S. Census Bureau Vintage 2025 estimates, https://www.axios.com/local/richmond/2026/03/31/metro-richmond-population-growth-2025-census-immigration-henrico-chesterfield · 2026-03

  • Richmond industrial vacancy was 5.5 percent in Q2 2026 with availability at 6.7 percent; the construction pipeline expanded to 12.6 million square feet; net absorption was 136,000 square feet; first-half 2026 deliveries were 1.5 million square feet versus 379,000 in the first half of 2025; average asking rent rose 2.4 percent to $8.86 per square foot.

    CBRE, 'Richmond Industrial Figures Q2 2026', https://www.cbre.com/insights/figures/richmond-industrial-figures-q2-2026 · 2026-07

  • The LEGO Group's 1.7-million-square-foot, $1 billion manufacturing facility is under construction at Meadowville Technology Park in Chesterfield County; the company broke ground in November 2025 on a 2-million-square-foot regional distribution center in Prince George County to support it.

    The LEGO Group, 'The LEGO Group breaks ground on new Regional Distribution Center in Virginia to support its US factory under construction' (November 2025), https://www.lego.com/en-us/aboutus/news/2025/november/the-lego-group-breaks-ground-on-new-regional-distribution-center-in-virginia-to-support-its-us-factory-under-construction; Engineering News-Record, 'LEGO Group's First US Manufacturing Campus Reaches Construction Milestone' · 2025-11

  • The Diamond District is a $2.4 billion redevelopment of 67 acres around the former ballpark site in Richmond; CarMax Park opened in April 2026 with a capacity of 9,585; the first mixed-use phase, including a 280-unit apartment building, 161 income-restricted units, a 180-room hotel, and retail, is targeted for completion in 2027.

    Richmond BizSense, 'Diamond District developers break ground on first mixed-use phase' (April 11, 2025); Axios Richmond, 'See Richmond's Diamond District transform over the years' (July 29, 2026); Wikipedia, 'CarMax Park' · 2026-07

  • Chesterfield County listed eight data-center projects in various stages of approval as of July 2026, including three planned Google campuses; the county estimates roughly $4.2 million in annual revenue for every $1 billion of data-center development; the Upper Magnolia Green and Watkins Centre sites were rezoned in May 2025.

    Chesterfield County, 'Data Centers', https://www.chesterfield.gov/datacenters · 2026-07

  • Virginia contractor licenses are classed by project size: Class C for projects from $1,000 to $10,000; Class B for single projects from $10,000 to $120,000 and up to $750,000 in a 12-month period, with a net worth of at least $15,000; Class A for projects of any size, with a net worth of at least $45,000. Class A and B applicants may substitute a $50,000 surety bond for the net-worth showing.

    Virginia Department of Professional and Occupational Regulation, Board for Contractors, as summarized in 'Virginia Contractor License Types: Class A, B, and C Explained', https://virginiacontractorauthority.com/virginia-contractor-license-types · 2026-09

  • Under Virginia mechanic's lien law, a memorandum of lien must be recorded no later than 90 days from the last day of the month in which the claimant last performed labor or furnished materials, and in no event later than 90 days after completion or termination; it may not include sums for labor or materials furnished more than 150 days before the claimant's last day of work, and including such amounts can invalidate the entire lien; the memorandum must be verified under oath.

    Fullerton & Knowles, P.C., '150-Day Rule in Virginia Mechanic's Lien Law', https://fullertonlaw.com/newsletters-published/150-day-rule-in-virginia-mechanics-lien-law; Levelset, 'Virginia Mechanics Lien Guide & FAQs', https://www.levelset.com/mechanics-lien/virginia-lien-law-faqs/ · 2026-09

FAQ

Questions Richmond owners ask first

Do you have an office in Richmond?

No. The firm is based in Scottsdale, Arizona, and that is the only office. We serve Richmond remotely and travel in for the assessment and for key meetings with your bank, surety, or leadership team. The travel is part of the engagement scope, so it does not show up unannounced on an invoice.

We need to move from a Class B to a Class A license. Can you help with the financial side?

Yes. The Class A application requires a net-worth showing of at least $45,000 or a $50,000 surety bond, and the balance sheet has to support it. We prepare financial statements on a consistent basis, set a distribution policy that keeps enough equity in the company, and coordinate with your CPA on the presentation. We are not a licensing service and do not give legal advice on license matters.

Our pay applications keep getting rejected by a national general contractor. Is that a finance problem?

It is. Every rejection resets the payment clock, and the cause is usually a missing lien waiver, a retainage miscalculation, or a schedule of values that does not match the contract. We build the pay application and lien-waiver package into the monthly billing process so it goes out right the first time, and we track each application from submission to deposit.

Can you help us increase bonding capacity?

We can build the file the surety wants before it says yes: a WIP schedule that reconciles to the ledger, statements prepared the same way every year, working capital that is really there, and an owner who can walk through the numbers. The bonding decision belongs to the surety and its agent. We remove the reasons for hesitation.

What does it cost?

Fractional Controller engagements begin at $2,500 per month and Fractional CFO engagements at $3,500. CFO Advisory begins at $5,000, Operating CFO at $8,500, and Embedded CFO at $12,500; interim leadership is custom. Those are starting points. The final number depends on size, entity count, transaction volume, how the books look on day one, urgency, and what your lender and surety need to see.

How fast can you start, and how long does it last?

Most assessments start within one to two weeks of the first call and run two to three weeks, with one on-site visit. A stabilization engagement typically lasts six to 12 months. Ongoing fractional work after that is month to month and continues only as long as it earns its fee. When cash is critical, say so up front and we compress the assessment into days.

Do you work with our Richmond CPA and our bank?

Yes, and the engagement works better when we do. Tax preparation, tax advice, and attest work remain with your CPA; the lending relationship remains with your bank. We hand each of them a reconciled ledger, a WIP schedule, and a forecast they can trust, which makes the CPA's year-end faster and the bank's covenant review shorter. Tax positions are theirs to decide. Your banker stays your banker.

What happens after the assessment?

You get a findings memo in writing. It states what is true about cash, margin, debt, and reporting, what should be fixed first, and a proposed scope with a starting price. If you proceed, the first 90 days go to cleanup and stabilization: the close calendar, the cash forecast, the WIP, and the lender package. After that we document the process and either run it for you or transfer it to your team.

Keep reading

What we do for Richmond companies

Every service and industry page applies here. These are the ones owners in this market ask about first.

Services

Industries

Insights

Calculators

Nearby markets

Consultation

Schedule a Financial Assessment for your Richmond business

Two to three weeks, delivered remotely from Scottsdale with an on-site visit in central Virginia, and you leave with a written picture of cash, margin, and debt plus a plan you can act on whether or not you hire us. Call (602) 892-5281 or use the contact page to schedule.

Confidential. Takes about two minutes. Every field helps us come to the first call prepared.

By submitting you agree to our privacy policy. We never sell or share your information.

Financial assessment

Let us look at what needs attention.

A confidential financial assessment starts with a 30-minute conversation about cash, reporting, and the decisions in front of you. No pitch deck. No obligation.